PLATFORM OS SIMULATED ENVIRONMENT · DESIGN TARGETS
--:-- SIM
INSTITUTIONAL DISTRICT · THREE NODES

One operating layer. Every asset. Every second.

Siena Platform OS shown operating a representative institutional district — a regional airport, a medical center, and a university campus at typical institutional scale. All data on this screen is simulated.

SYSTEM STATUS
ALL SYSTEMS NORMAL
CONTINUOUS MONITORING
SERVICE AVAILABILITY
99.98%
LAST 30 DAYS
DESIGN TARGET
COOLING DELIVERED
97,200
TON-HOURS (MTD)
ILLUSTRATIVE
THERMAL STORAGE
82%
CHARGED · READY
ILLUSTRATIVE
PLANT EFFICIENCY
1.08
kW / TON · DESIGN BASIS
DESIGN TARGET
ACTIVE ALERTS
3
REQUIRE ATTENTION
SIMULATED

DISTRICT SCHEMATIC — SIENA-OWNED THERMAL INFRASTRUCTURE

CHILLED-WATER SUPPLY RETURN SIENA OWNERSHIP BOUNDARY
SIENA-OWNED INFRASTRUCTURE CENTRAL PLANT 4 / 4 CHILLERS THERMAL STORAGE 82% CHARGED PUMPS & HEAT EXCHANGE N+1 REDUNDANT THERMAL DISTRIBUTION NODE 01 · REGIONAL AIRPORT 6,400 TONS · SERVICE NORMAL NODE 02 · MEDICAL CENTER 5,100 TONS · SERVICE NORMAL NODE 03 · UNIVERSITY CAMPUS 4,300 TONS · SERVICE NORMAL SIENA PLATFORM OS Command & visibility Optimization & dispatch Predictive maintenance Service reporting Secure by design TELEMETRY 14,180 PTS DISPATCH LOOP 9 ms SUPERVISION 24 / 7
REGIONAL AIRPORTNODE 01
6,400 TONS COOLING LOAD
SERVICE WITHIN CONTRACT LEVELS
MEDICAL CENTERNODE 02
5,100 TONS COOLING LOAD
SERVICE WITHIN CONTRACT LEVELS
UNIVERSITY CAMPUSNODE 03
4,300 TONS COOLING LOAD
SERVICE WITHIN CONTRACT LEVELS

OPERATIONS FEED — SIMULATED

WATER STEWARDSHIP — MODELED

8.6M
GALLONS AVOIDED (MTD) · MODELED

Engineered water systems and recovery loops are designed to reduce district water draw versus stand-alone facility plants. Values shown are modeled design estimates, not measured results.

24 HOURS OF CONTINUOUS READINESS

The operating day

The district builds thermal reserve when demand is low and deploys it when conditions demand — shifting cooling production, never comfort. Simulated time runs continuously; the cycle below follows it.

DISTRICT CLOCK

--:-- SIMULATED

THERMAL STORAGE — CHARGE / DISCHARGE (SIMULATED 24H)

DETERMINISTIC DEMONSTRATIONS · SIMULATED

How the district responds

Each scenario runs the same modeled district through a different condition. Watch the schematic, storage and service levels on the Overview tab respond — service holds in every case. That is the design intent — infrastructure should be designed for the moment it matters most.

TYPICAL DAY
Baseline operation. The plant serves district load directly, storage charges overnight and holds ready, and all three nodes receive service within contract levels.
SERVICE AVAILABILITY
99.98%
DESIGN TARGET · HELD IN ALL SCENARIOS
STORAGE CONTRIBUTION
OF DISTRICT LOAD
SIMULATED
NODES IN SERVICE
3 / 3
CONTRACT LEVELS MAINTAINED